Hauling Road

Hauling Road

Hauling Road

For the purposes of the coal haul road from the mining area (CCP) to stockpile while at the turning area (Tersus), PT Mifa Bersaudara has acquired land along & plusmn; + 12.9 km and a width of 50 meters. Wide special transports coal bitch this is known as the Road 5, constructed with a width of about + 25 meters and the rest with a width of 25 meters will be allocated as reserve forward as development of the transport system, for example by building a track conveyor (overland conveyor / OLC Phase 2) , The path consists of community plantation area, secondary forest and swamp lowland swamp. Construction of the facility began in 2013 (including land clearing work) is done by local contractors, and can be completed by the end of 2014.

The design of this road can be traversed by Truck Hauling capacity DT DT 80 CUM single vessel, with the technical specifications of pavement design in the form of sub-base thickness of 250 mm and 150 mm thick base Course. At STA KM 6 built bridges with the design as follows:

No Components Bridge Specifications
1 Concrete Plates
  • Reinforced concrete slab 200 mm
  • On the required maximum and lower reinforcement area = 948 mm & sup2;
  • Install reinforcement D16-100, As = 1,366 mm & sup2; & gt; 948 mm & sup2;
2 Steel Beams Home
  • By using part of the IWF 700 x 300 x 13 x 24
  • Stressing the maximum ratio = 0.734 & lt; 1
  • The maximum deflection = 1.55 cm & lt; 5:00 cm.
3 Secondary Steel Beams
  • Using IWF 346 x 174 x 6 x 9
  • Stressing the maximum ratio = 0.018 & lt; 1
4 Pole Foundations
  • Total Reaction Combined = 172.49 tons
  • Installed 16 No. of & Oslash; 20 "steel pipe piles x 12.7 mm wall thickness, length 23 m
  • The amount of allowable bearing capacity = 960 tons & gt; 172.49 tons